 |
TEQUILA CLUB - Sofia
Situated in a hotel building, Tequila
Club had heavy sound insulation problems. After an reconstruction
in year 2002 sound insulation index was improved with
14 dB.
|
|
|
Restaurant ‘K2” – town of Plovdiv
The internal acoustical treatment
of the restaurant strongly reduced the unwanted noise
floor.
|
 |
|
 |
“Lavazza” Cafeteria - Sofia
Design, supply and installation of
the back-ground music system.
|
|
|
Open-field Disco-club “Theodora” – town
of Sozopol
Design of the open-field club in
the center of the town and protection of the near-field
buildings from the extremely high SPL in the venue.
|
 |
|
 |
“Silvy Music” Studio
Re-design of the main studio and
control room to meet international acoustical standards.
Design of pre-production room with vocal booth.
|
|
|
Acoustical Simulation
of The Parliament Hall - Sofia
For solving the problems of the sound
reinforcement system of Main Parliament Hall in Sofia
an acoustical simulation (EASE 3.0) was made in year
2001.
The results from the simulation were the backbone of
structuring the new sound reinforcement system of the
hall.
|
 |
|
 |
National Palace Of
Culture – Sofia, Studio 1
In 1996 a full reconstruction of
the studio take part. New digital equipment and outboard
were incorporated.
In 1998 a pre-production studio was build and linked
with the main studio.
|
|
|
“KEY” Studio - Sofia
Designed and built in 2001 –2002.
Includes studio, drum booth, control room and office
area.
|
|
|
| home | products
| services | projects
| about | links |
| |